EasyManuals Logo

IBM Storwize V5100 MTM 2078-424 User Manual

IBM Storwize V5100 MTM 2078-424
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #35 background imageLoading...
Page #35 background image
Chapter 2. Installing the system hardware
After verication that you have all of the hardware components that you require, you can install them.
You completed the initial steps of verifying the shipping contents and becoming familiar with the
hardware components. You veried that the power and environmental requirements are met and planned
the location of the enclosures. You are now ready to begin installing the hardware components and
connecting the data cables and power cords.
Installation overview
The installation and initial conguration of your system is your responsibility, following the plan that you
created using the planning information in the Knowledge Center.
Hardware installation tasks that you must complete
To install the Storwize V5100 hardware, you must complete the following tasks:
Important: You must complete the planning tasks and have completed worksheets so that you can
proceed with installing and initializing your system.
1. You must unpack and install the Storwize V5100 control enclosures and any optional SAS expansion
enclosures in the rack.
2. Referring to the worksheets that you created, you must complete the cabling.
Note:
If you intend to add the Storwize V5100 control enclosure to an existing system, you simply install the
control enclosure, because the existing system is already initialized.
Initial setup tasks that you must complete
After the hardware is installed, connect a workstation to the technician port of one of the node canisters
in the Storwize V5100 control enclosure and complete the following tasks:
1. Congure the system with a name and management and service IP addresses.
Note:
If you intend to add the Storwize V5100 control enclosure to an existing system, you simply install the
control enclosure, because the existing system is already initialized.
2. Log in to the control enclosure using the management GUI, and complete the system setup wizard
using information from the worksheets you created.
First customer tasks
After you complete the service setup process, you can log in to the Storwize V5100 management GUI and
complete the following tasks using the customer setup wizard:
1. Change the system password.
2. Set the date and time.
3. Create I/O groups (if applicable).
4. Conrm the Call Home settings that you entered during the installation.
5. Congure licensed functions.
6. Create storage pools.
At the completion of the setup wizard, the setup wizard creates storage arrays and assigns the MDisks to
the storage pools.
©
Copyright IBM Corp. 2019 11

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V5100 MTM 2078-424 and is the answer not in the manual?

IBM Storwize V5100 MTM 2078-424 Specifications

General IconGeneral
BrandIBM
ModelStorwize V5100 MTM 2078-424
CategoryDisk array system
LanguageEnglish

Related product manuals