14 BOILER ASSEMBLY - EXPLODED VIEW (300kW VERTICAL BOILER SHOWN)
DETAIL OF DRAIN ASSEMBLY DETAIL OF GAS HEADER FLEXIBLE HOSES
LEGEND
1. Flue sampling point
2. Wiring centre
3. Water header
4. Gas pressure test point
5. 50kW module
6. Module cover
Note. M12 ange bolts must be tted pointing away
from the module for the outer connections and pointing
towards the module for the inner connections.
ASSEMBLY