Commissioning and Operation
‑81‑
7.2 Commissioning Steps
See SV660F Series Servo Commissioning Guide.
7.3 Commissioning, Operation, and Maintenance Requirements
Basic requirements
Technical staff must be trained to understand the requirements and principles of
designing and operating safety‑related systems.
Person performing the maintenance must be trained to understand the
requirements and principles of designing and operating safety‑related systems.
Operators must be trained to understand the requirements and principles of
designing and operating safety‑related systems.
The safety‑related circuit on the control board that fails to operate must be
replaced with a new one as it is not repairable.
Commissioning Checklist
Start‑up test and validation
IEC 61508, EN/IEC 62061 and EN ISO 13849 require the final assembler of the
equipment to verify the operation of the safety function through acceptance
testing. This acceptance test is described in the drive manual. The testing of
optional safety features is described in the corresponding manuals.
The acceptance test must be performed:
at initial start‑up of the safety function
after any changes related to the safety function (wiring, components, settings
and so on).
after any maintenance work related to the safety function.
The acceptance test of the safety function must be carried out by an authorized
person with expertise and knowledge of the safety function. The test must be
documented and signed by the test staff.
Signed acceptance test reports must be stored in the logbook of the machine. The
report shall include documentation of start‑up activities and test results,
references to failure reports and resolution of failures. Any new acceptance tests
performed due to changes or maintenance need to be logged into the logbook.
Checklist
Step
Action Result
1
Ensure that the drive runs and stops freely during commissioning.
2
Stop the drive (if running), switch the input power supply off and
isolate the drive from the power line by a disconnector.