Chapter: Requirements
30 M10-17411-EN
Checklist for site preparation
The following checklist provides a quick summary of items that should be considered
when planning and preparing the site location of your testing system. Additional
information regarding each item below is provided within this manual. If you need more
specific information, contact Instron
®
Service or your local Instron
®
office for
assistance.
Not all computers are compatible with Instron testing systems. If you intend to purchase
a computer from an outside vendor, contact Instron
®
Service to verify its compatibility.
Additional charges may result from service that is required to evaluate or reconfigure
non-approved computers.
Site location
•
Floor and table is able to support the weight of the frame, and its computer
components.
• Environment complies with the specifications for your specific model:
• Operating temperature
• Storage temperature
• Humidity
• Atmosphere
• The required power supply is available and is compatible with the electrical
requirements for your specific model.
P8
(includes
10A fuse)
United Kingdom
PA India and South Africa
Table 6. Power cords (Continued)
Power cord designation Matching receptacle Locale