EasyManuals Logo

jcb 2CX User Manual

jcb 2CX
414 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #162 background imageLoading...
Page #162 background image
With the Butane Heater assembly 892/00350, seal the
connection using the following procedure.
a Remove the cap A from the end of the disposable gas
cartridge B.
b Before assembling the gas cartridge to the reflector
element C, turn the red ring D to the left, (in the
direction of the minus sign marked on the ring).
c Position the tube hanging down from inside the reflector
assembly into the hole at the top of the gas cartridge.
Then press the gas cartridge up into the reflector
assembly as far as possible until the two elements are
clasped firmly together. A click will be heard.
d Turn the small ring E so that the air holes at F are
completely closed.
Wiring Harness - Repair Procedure (cont'd)
23 - 2
Section C Electrics Section C
23 - 2
Service Procedures
9803/7130 Issue 1
S189490/1
S189490/2
S189490/3
S189490/4
AA
BB
CC
DD
FF
EE
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk
www.maskinisten.net

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 2CX and is the answer not in the manual?

jcb 2CX Specifications

General IconGeneral
Brandjcb
Model2CX
CategoryFront End Loaders
LanguageEnglish

Related product manuals