38 – Getting Started
Connecting the Transmitter
After the transmitter and receiver have been installed, the components must be connected to
each other.
1. Set up the system as shown (Figure 16).
Figure 16: SWS Front Setup
2. A 10 m hybrid (FC/PC-FC/APC) jumper is supplied with the receiver; the FC/PC end has a
black boot and the FC/APC end has a green boot. Attach the FC/APC end to the Tx In
connector on the receiver’s control module (top port). Connect the flat FC/PC end to any
Output port on the front of the source optics module.
3. Using the 0.5 m hybrid jumper supplied with the receiver, attach the FC/APC end to the To
Device connector on the receiver’s control module (bottom port). Connect the flat FC/PC end
to the first channel on the receiver’s detector module.
Installing Additional Detector Modules
More detector modules can be added to the chassis to enable testing of several channels
simultaneously. The standard SWS package includes a chassis that can hold eight detector
modules and a single control module. When more than eight detector modules (16 channels)
are required, the extra modules are installed in the system by adding another chassis. Order the
required number of SWS15107 Dual Detector Modules. Each additional chassis (OWB10002
Chassis) includes the required 50-pin ribbon cable. Up to eight chassis can be daisy-chained
together to form one receiver station.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com