EasyManua.ls Logo

Johnson Controls Frick AcuAir - AcuAir Air Handler Prestart-Up Checklist; Prestart-Up Checklist: General Unit Inspection; Prestart-Up Checklist: Fan Inspection; Prestart-Up Checklist: Burners

Johnson Controls Frick AcuAir
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
210.100-IOM (JUL 2021)
Page 53
AcuAir Hygienic Air Units
Installation - Operation - Maintenance
Fan inspection
 Verify that bearings and locking collars have correctly
tightened setscrews, bolts and nuts.
 Fan wheel correctly aligned, tight on shaft and freely moving.
 Sheaves correctly aligned and tight on shaft.

Veried
fan base isolators and thrust restraints for correct
adjustment.
Note: Do not remove functional bolts from seismic isolators.

Belt tension adjusted correctly for each drive package label on fan.

Veried fan alignment with unit discharge. Adjust with
isolation.  Fan bearings correctly lubricated.
Prestart-up check (for site records)
General unit inspection
Identify and perform appropriate lockout/tag out and safety rules. For details on points below, see appropriate section of
Installation, Operation, Maintenance manual provided with each air handler. For VFD equipped air handlers, refer to the VFD
forms for additional start-up requirements.
AcuAir air handler prestart-up checklist
Name of installing contractor ______________________________ Unit tag No. _______________________________________
Qualied technician’s name _______________________________ Unit model No. ____________________________________
Frick sales order No. _____________________________________ Unit serial No. _____________________________________
Job name _______________________________________________
Job site location _________________________________________
Job site contact and phone No. ____________________________
 Unit inspected for damage interior and exterior.  Condensate drain correctly trapped.
 Unit installed on at and level surface. Outdoor unit mounted
within roof slope limitations where applicable.
 Air hoods installed correctly.
 Package installed according to 090.400-SB, Proper Installation
of Electronic Equipment.
 Terminal screws and wiring connections secure
in control, electric and air modulator panels.
 All shipping splits sealed and secured correctly.  Verify
that all ductwork is complete and available for full airow.
 Unit installed with correct clearances.  Clean air lters installed correctly and secured.
 Visually inspect roof curb for tight seal around unit.  Damper linkage is tight and in correct Power off position.
 All shipping bolts and other material have been removed. Fan,
VIFB, Energy Recovery Wheel, Damper
 Pipe chase oor sealed at penetrations.
 All shipped loose parts installed. 
Pneumatic tubing for room pressure sensors is in place.
 Controls installation complete.  Filter gauge is installed in supply ductwork and set to zero
 Remote Panel is mounted and wired.
 Verify all plastic spacers have been removed between door and
door frame.
 Unit control panel is accessible, for example, catwalk, ladder.
 Verify energy recovery wheel turns freely and wheel segments
are fully engaged.
 All eld wiring complete and inspected.  Installer has cleaned out interior.
 All wiring and tubing connections made at
shipping splits. 
Correct line voltage is supplied at disconnect.
 All eld piping connections complete.
Burners
 Gas supply is provided up to unit. 
Flue is installed, if needed.

Gas supply pressure is correct.

Gas line is purged.

PRV installed, if required?
I have reviewed, understand, and acknowledge the terms and conditions of Johnson Controls start-up policies detailed
in this document. The information that is provided in the prestart-up checklist is accurate.
Authorized signature Authorized rm Phone No.
FAX to Johnson Controls - Frick Service: 717-762-8624

Table of Contents

Other manuals for Johnson Controls Frick AcuAir

Related product manuals