EasyManua.ls Logo

Johnson J2R4SUC 2007 - Installation

Johnson J2R4SUC 2007
179 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
68
FUEL SYSTEM
INSTALLATION
IMPORTANT: After installing float, inspect for
smooth movement of float.
Checking Float Height
Measure the float height.
• Float height: 10 ± 2 mm
IMPORTANT: Float weight cannot be applied to
needle valve.
Install the pilot jet, pilot air jet, and main air jet.
INSTALLATION
Installation is reverse order of removal with spe-
cial attention to the following steps.
IMPORTANT: Do not re-use the removed gas-
ket. Always use a new gasket.
Tighten the carburetor mounting bolts to 7.0 ft.
lbs. (10 N·m).
Refer to Throttle Adjustment on p. 69.
1. Spring 005978
Float Height 005990
1. Pilot jet
2. Pilot air jet
3. Main air jet
005991
1
3
1
2
005970
1. Bolts 005963
11

Table of Contents