EasyManua.ls Logo

JRC JLR-30 - Page 26

JRC JLR-30
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-8
Installation Procedure for Optional Mount Base for NNN-20
1. Install the mounting base to the pole by using fixing brackets, M8 bolts, flat washers, spring
washers, and nuts. Then, secure the sensor to the mounting base. Beware of the bow
direction.
BOW
GPS3
GPS1
GPS2
Nut
Hex bolt
Nut (M8)
Hex bolt (M8)
Mounting base
Spring washer
Flat washer
Flat washe
r
Spring washer
Pole (dockyard supply)
Φ60.5 –Φ89.1 mm steel pipe is recommended
Flat washer
Spring washer
Flat washer
Fixing bracket
Fix horizontally
to the keel line

Table of Contents

Related product manuals