EasyManua.ls Logo

JVC HR-D540EE - Inspection and Maintenance

JVC HR-D540EE
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.4
INSPECTION
AND
MAINTENANCE
This
product
employs
rotary
and
moving
parts
which
wear
out
in
the
course
of
usage.
Periodic
inspection,
cleaning,
lubrication
and
maintenance
are
therefore
important
for
ensuring
maximum
performance.
Worn
parts
must
also
be
replaced
at
when
required.
Upper
drum
A/C
head
Pinch
roller
Full
erase
head
Tension
arm
Lower
drum
Capstan
(shaft)
Half
loading
gear
Guide
arm
Transport
Capstan
motor
Loading
Belt
Reel
Beit
Take-up
ree!
disk
Supply
reel
disk
Clutch
assy
Loading
motor
Worm
clutch
assy
assy
:
Cleaning
w
:
Cleaning
(or
Replacement
if
necessary)
4
:
Lubrication
No:
Refer
to
Main
mechanical
parts
1.4.1.
Suggested
servicing
schedule
for
main
components
The
following
table
indicates
the
suggested
period
for
such
service
measures
as
cleaning,
lubrication
and
replacement.
In
practice,
the
indicated
periods
will
vary
widely
according
to
environmental
and
usage
conditions.
However,
the
indicated
components
should
be
inspected
when
a
set
is
brought
for
service
and
the
maintenance
work
performed
if
necessary.
Also
note
that
rubber
parts
may
deform
in
time,
even
if
the
set
is
not
used.
4
:
Lubrication
(or
Replacement
if
necessary)
@
:
Replacement
©
:
Inspection
or
Replacement
if
necessary
Table
1-4-1
Approximate
maintenance
schedule
1-7

Related product manuals