Operating Instructions KBL 3500
14
The wiring for 3-phase operation is shown below:
E2.10
X2.6
X2.3
X2.9
X6.6
X6.3
X6.9
F1.B
X1.2
X1.1
X9.7
K1.1
K1.3
K1.5
F0 N3 N2 N1
NL3L2L1PE
PE
L1
L2
L3
Mains
3 x 220 V / 60 Hz
1
2
3
The wiring for 2-phase operation is shown below.
Re-wire the 3 cables according to the diagram.
Make sure that you use the right cable for the power supply.
E2.10
X2.6
X2.3
X2.9
X6.6
X6.3
X6.9
F1.B
X1.2
X1.1
X9.7
K1.1
K1.3
K1.5
F0 N3 N2 N1
N L3L2L1PE
PE
L1
N(L2)
bridge
Mains
2 x 220 V / 60 Hz
1
2
3
External timer
Connect the external timer (e.g. coin box, studio control) according
to the instructions supplied with the timer. The connection is made
via the socket for an AMP plug on the back side of the device. The
following diagram shows the wiring of the timer connection.
timer
L1
start
remote start
11
13
1
2
socket for AMP plugAMP plug
1.
2.
3-phase operation3-phase operation
2-phase operation2-phase operation