EasyManua.ls Logo

Keysight N9020A - Post-Repair Procedures

Keysight N9020A
642 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
562
Post-Repair Procedures
Post-Repair Procedures
Post-Repair Procedures
Table 15-1 lists the adjustments and performance verification tests needed
after an assembly replacement.
After an assembly is replaced, find the assembly that has been replaced in the
left-hand column, and then perform the recommended adjustment and/or
performance verification test. Making the recommended adjustments and/or
performance verification tests doesn’t guarantee all published specifications
are being met. Only a full instrument calibration will do this.
NOTE Refer to the analyzer user’s guide for information on instrument warm-up
before performing any of the procedures listed in this chapter.
The following procedures are also included in the Additional Tasks” on
page 567.
“Calibration Data Backup and Restore”
“BIOS Settings Verification
“End User License Agreement (EULA) Acceptance (Software versions
A.06.08)”
“End User License Agreement (EULA) Acceptance (Software versions
A.07.00)”
“FPGA Synchronization
“Programming Model and Serial Numbers”

Table of Contents

Other manuals for Keysight N9020A

Related product manuals