EasyManua.ls Logo

Konica Minolta REGIUS 110 HQ - 2.1 Flow of Unpacking and Installation

Konica Minolta REGIUS 110 HQ
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.1 Flow of Unpacking and Installation
2-2
2.1 Flow of Unpacking and Installation
This section describes the workflow from unpacking to installing the delivered product.
Item Outline
Unpacking Unpack goods after arrival.
For further details, refer to “2.2 Unpacking.
Removing Protective Parts Remove the protective parts from the machine interior.
For further details, refer to “2.3 Removing Protective Parts”.
Changing Operation Panel
Installation Position
(Vertical Installation
Configuration Only)
For the vertical installation configuration, change the installation position
of the operation panel.
For further details, refer to “2.4 Changing Operation Panel Installation
Position.
Moving to and Fixing at
Installation Location
Move the machine and fix it at the installation location.
For further details, refer to “2.5 Moving to and Fixing at Installation
Location”.
Checking of Input Voltage Check the input voltage.
For further details, refer to “2.6 Checking of Input Voltage”.
Connecting Power Cable Connect the power cable.
For further details, refer to “2.7 Connecting Power Cable”.
Checking Startup and
Shutdown
Check that the machine starts up and shuts down properly.
For further details, refer to “2.8 Checking Startup and Shutdown of Unit”.
Unpacking and Completion
of Installation
0404YF220A.book 2 ペー 009年8月20日 木曜日 午後1時26分

Other manuals for Konica Minolta REGIUS 110 HQ

Related product manuals