EasyManuals Logo

Konica Minolta REGIUS 110 HQ User Manual

Konica Minolta REGIUS 110 HQ
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
1.1 Preparations for Installation
1-4
1.1.5 Checking Unpacking Area
Check that the unpacking area meets the following requirements:
Check that the area has an indoor environment equivalent to that of the installation location.
Make a space as described below available for performing unpacking work.
The surface where a packing label is attached along the longer side is the front side.
1.1.6 Checking Transfer Path
The unit has casters for mobility.
Check that the transfer path from the unpacking area to the installation location meets the following
requirements:
There are no steps or steep slopes, etc. that may affect the unit during transfer.
The doorway of the room through which the unit (width: 365mm) will pass through should be
sufficiently large.
There should be no deformations on the floor surface even after transporting the unit (weight:
approximately 102kg).
1.1.7 Checking Network
When connecting to the facility network, contact the network administrator for the following information.
IP address and subnet mask of the unit
IP address of the gateway (if a gateway is used)
800mm minimum 800mm miminum
2520mm minimum
2000mm minimum
1000mm minimum
3460mm
minimum
Front
Packing label
Packing case
0404YF220A.book 4 ペー 009年8月20日 木曜日 午後1時26分

Other manuals for Konica Minolta REGIUS 110 HQ

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Konica Minolta REGIUS 110 HQ and is the answer not in the manual?

Konica Minolta REGIUS 110 HQ Specifications

General IconGeneral
BrandKonica Minolta
ModelREGIUS 110 HQ
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals