EasyManua.ls Logo

KSB CPK - Default Chapter; Table of Contents

KSB CPK
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CPK
Contents
Point no. Description Page no.
1 General 1
1.1 Handling 1
2 Installation (on site) 1
2.1 Foundation 1
2.2 Base frame and Pump 1
2.3 Alignment of pump and driver 1
2.4 Connecting the piping 1
2.4.1 Auxiliary connections 2
2.4.2 Vacuum balance line 2
2.5 Coupling guard 2
2.6 Measuring Instruments 2
2.7 Final check 2
3 Commissioning, Start-up/Shutdown 2
3.1 Preliminary remarks regarding
commissioning 2
3.1.1 Lubricants 2
3.1.2 Shaft seal 2
3.1.2.1 Stuffing box 3
3.1.2.2 Shaft seal 3
3.1.2.3 Cooling to casing cover 3
3.1.2.4 Packing the stuffing box 3
3.1.2.5 Packing material 4
3.1.2.6 Sealing liquid 4
3.1.3 Alternate packing arrangement available 4
3.1.4 Checking the direction of rotation 4
3.2 Start-up 4
3.3 Shut down 4
4 Maintenance and lubrication 4
4.1 Supervision of operation 4
4.2 Bearings and lubrication 5
4.2.1 Lubricant quantities 5
4.2.2 Oil changes 5
4.2.3 Procedure 5
4.3 Preservation 5
5 Special instructions 5
5.1 General precautions 5
5.2 Dismantling 5
5.2.1 Soft-packed stuffing box 5
5.2.2 Mechanical seal stuffing box 6
5.3 Reassembly 6
5.3.1 Reassembly of stuffing box packing 6
5.3.2 Reassembly of mechanical seal 7
5.4 Cooling / heating 7
5.5 Spares 8
5.5.1 Ordering spare parts 8
6 Interchangeability of pump components 9
7 Recommended stock of spare parts
for 2 years of operation 10
8 Faults 10
8.1 Faults, causes and suggested remedies 10
8.2 Cause-Remedy 10
9 Sectional drawing & part list 12
9.1 Sectional drawing of CPK Y pumps 13
Annexure I 14
Annexure II 16
Annexure III 16
Annexure IV 17

Related product manuals