2LK/2LN/2LM/2LC
1-5-55
3. Remove six screws.
4. Unhook two hooks and then remove the
engine PWB.
5. Check or replace the engine PWB and
refit all the removed parts.
*: When replacing the engine PWB,
remove the EEPROM (U100) from the
engine PWB and then reattach it to the
new engine PWB.
Figure 1-5-86
U100
Screws
Hook
Hook
Screws
Screws
EEPROM
(U100)
Engine PWB
Engine PWB
Engine PWB
Engine PWB