EasyManua.ls Logo

KZ Venom - Page 56

KZ Venom
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
at the lower right corner of Liquid Control Center.
L—Main menu to operate the full water system including filling and
distributing as desired. Note the 5 VALVES which direction they
need to be positioned and/or turned correctly to accomplish your
intent on the following diagram and described on page 47.
1. Power fill Storage Tank: Place ALL valves in positions as shown
in #1. Your R.V. does NOT have a gravity water fill, so filling the tank
occurs in this method only.
(a) Attach a garden hose to the city connection C, lower left
corner. Open supply faucet and fill tank. You cannot visually see
PDF created with pdfFactory trial version www.pdffactory.com

Table of Contents

Related product manuals