EasyManuals Logo

Lamtec LT3 Quick Reference

Lamtec LT3
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
27
5 Maintenance
5 Maintenance
As a result of extensive self-diagnosis, the measuring system is essentially maintenance-free.
Maintenance is restricted to the calibration and the cleaning of dust or other deposits; as well
as the cyclic replacement of the ZrO
2
measuring element.
5.1 Checking/Calibrating the KS1D Combination Probe
The checking / calibration should (advantageously installed) be built in at normal operating
temperature and carried out under operating conditions.
Recommended time spans (cycles):
6 hours after commissioning
12 months for natural gas combustion systems
5.1.1 Checking/Calibrating the Air Voltage (Offset)
1. Switch off the plant.
If you cannot switch off the plant, the probe must be dismantled. Observe the safety no-
tices!
2. Pre-ventilate, until there is no longer any flue gas at the measuring point (about 1 minute).
3. End the pre-purge.
4. Perform the offset calibration of the O
2
(U-O2) and CO/H
2
(U-CO) electrodes.
See Chapter 5.1.9.1 Offset Calibration perform to 21 % O2.
5.1.2 Checking/Calibrating the O
2
Electrode
See Chapter 5.1.11 Checking/Calibrating with Reference Measurement.
5.1.3 Checking/Calibrating the CO/H
2
Electrode
See Chapter 5.1.9.3 Perform a Calibration of the CO/H
2
Electrode.

Table of Contents

Other manuals for Lamtec LT3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lamtec LT3 and is the answer not in the manual?

Lamtec LT3 Specifications

General IconGeneral
BrandLamtec
ModelLT3
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals