EasyManua.ls Logo

lancer MVU TOWER - Pre-Intallation Checklist

lancer MVU TOWER
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRE-INSTALLATION CHECKLIST
BEFORE GETTING STARTED
Each unit is tested under operating conditions and is thoroughly inspected before
shipment. At the time of shipment, the carrier accepts responsibility for the unit. Upon
receiving the unit, carefully inspect the carton for visible damage. If damage exists, have
the carrier note the damage on the freight bill and le a claim with carrier. Responsibility for
damage to the dispenser lies with the carrier.
4
TOOLS & ACCESSORIES
 CO2 Regulator Set  Beverage Tubing
 CO2 Supply  Water Booster (if necessary)
 Remote System  Oetiker Clamps/Fittings
 Wrenches  Slotted Screwdriver
 Tubing Cutters  Drill
CONSIDER LOCATION OF THE FOLLOWING PRIOR TO INSTALL
 Water supply lines  Is the countertop at least 1 inch thick?
 Grounded electrical outlet.  Drain
 Is there enough space to install the dispenser and the junction box?
BIB SYSTEM
 BIB Rack  BIB Regulator Set
 BIB Connectors - verify correct amount for syrup lineup
 BIB Syrup Boxes  Remote Cooling/Carbonation System

Related product manuals