April 8, 2011 HN FAQ Memo, Version 2.0 Page 44 of 108
Step.9
Remove the waste funnel and clean the funnel and the tube with the detergent
solution.
Step.10
Assembly all parts and mount the dosage needle in the dosage head.
Request a CIP from the AI. (menu 4.2.3.2.6 Req. CIP)
Check and measure the amounts of water flushed through both the dosage line
and the mainline.
Se chapter 3.2.2 Measuring the water amounts during AI cleaning.
Repeat the necessary cleaning steps if the amounts are too low.
Step.11
Close AI and refill sticks once the clima conditions are ok.
From outside AI to
manifold.
From manifold to dosage
head (2 pcs.)
From diluent bag to
manifold.
From manifold to mainline
out valve.
From manifold to mainline
out valve.
From diluent bag to
manifold.