April 8, 2011 HN FAQ Memo, Version 2.0 Page 62 of 108
3.3.7 C200 parameters from diff. HN Farms.
Table A: C200 parameters from Tange Skov gård (TSG)– 20. oktober 2009
Blowing after middle phases
Blowing after final phase
Temp Limit outgoing water.
Min. time circulation cleaning.
External air injection delay
Extra flushing pulse air time (trombone)
Acid/desinfection circulation (cleaning time)
Pulse after blowing air time ON
Pulse after blowing air time OFF
1
Should possible be increased to 8.
2
Must not be0, in order to dry the HN
Table B: C200 parameters on Hanninggård HNG – 1. december 2009
Blowing after middle phases
Blowing after final phase
Temp Limit outgoing water.
Min. time circulation cleaning.
External air injection delay
Extra flushing pulse air time (trombone)
Acid/desinfection circulation (cleaning time)
Pulse after blowing air time ON
Pulse after blowing air time OFF