Assembly group Requirement Check
The categories of the three-point linkage of the tractor match the
categories of the cross shaft or the lower link pin and the top link pin.
If the categories dier, the three-point linkage of the tractor or the
connecting system of the machine has been aligned.
c
Electrical connections
Ä
Chapter 12.7.1
‘Electrical connections’
on page 80
An electrical connection is available on the tractor for each consumer.
c
Hydraulic connections
Ä
Chapter 12.7.2
‘Hydraulic connections’
on page 80
A hydraulic connection and a suitable control unit is available for each
consumer.
c
Hydraulic oil
Ä
Chapter 12.9 ‘Operating
materials’ on page 81
The hydraulic oils of the machine and the tractor are compatible.
c
Axle loads
Ä
Appendix D ‘Calculation
of axle load and ballasting
for mounted machines’
on page 97
The axle loads and the required ballasting have been determined and
taken into account.
c
4.1.2.2 Preparing tractor
The tractor is prepared before attaching the machine. For this purpose,
the user must carry out various checks and adjustments.
The following information about the tractor is required:
n Air pressure of tyres
n Instructions for adjusting the lifting rods
n Instructions for adjusting the check chains or stabilisers
WARNING
Risk of accident due to the machine tipping over
If the tractor’s lifting rods are not set rigidly and the slots
are not locked, the machine may tip over at the borders.
– Set the lifting rods rigidly.
– Lock the slots.
Keep the tractor documentation
ready
Commissioning
en-GB | Item no. 17516276 | BA 01/2023-09 27