EasyManua.ls Logo

LEMKEN Opal 080 E - Environmental Protection; Maintenance Intervals; After Initial Commissioning (after no more than 2 Hours); Daily Checks

LEMKEN Opal 080 E
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and repairs
53
13.2 Environmental protection
Ensure that all materials and operating supplies used to
maintain and care for the device are disposed of in line with
environmental regulations.
All recyclable components should be recycled.
Observe the national regulations applicable in your country.
13.3 Maintenance intervals
13.3.1 After initial commissioning (after no more than 2 hours)
Check
What needs to be done?
Bolted connections
Tighten all the bolts and nuts on the implement to the
appropriate tightening torque, see «Tightening tor-
ques, page 54».
13.3.2 Daily checks
Check
What needs to be done?
Hydraulic hoses
Check the hydraulic hoses for damage and
leaks.
Replace damaged or faulty hydraulic hoses im-
mediately.
Hydraulic hoses must be replaced within six years
from the date of manufacture.
Always use LEMKEN-approved hydraulic hoses.
Safety equipment
Check that the safety equipment is working pro-
perly. See «Safety features of the device, page
11».
Soil working implements
Check all the soil working implements for dama-
ge and wear.
Replace damaged or worn components.

Table of Contents

Related product manuals