A video of this procedure is available at YouTube: https://youtube.com/playlist?list=PLYV5R7hVcs-
DoEcxrm2zKNpaKOdZ3f8Qc
.
Procedure
Step 1. Lay the server on its side for easier operation.
Step 2. Hold the power distribution board by its edges, and align the slots on the board with the four tabs
on the power supply cage.
Step 3. Slide the power distribution board toward the power supply cage until it clicks into place.
Figure 95. Installing the power distribution board of the hot-swap power supply
Step 4. Connect the power cables to the power distribution board; then, properly route the cables, and
secure the cables with the cable clips.
Step 5. Align the slot on the power distribution board cover with the one on the power supply cage; then,
secure the power distribution board cover with the screw.
Chapter 4. Hardware replacement procedures 169