EasyManua.ls Logo

Lenovo ThinkSystem ST250 V2 - Install the Server into the Rails

Lenovo ThinkSystem ST250 V2
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
After this task is completed
1. Place the server on its side with the cover up.
2. To install the server to the rails, see “Install the server into the rails” on page 194.
Install the server into the rails
Follow instructions in this section to install ST250 V2 into the rails.
S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off the
electrical current supplied to the device. The device also might have more than one power cord. To
remove all electrical current from the device, ensure that all power cords are disconnected from the
power source.
S014
CAUTION:
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is
authorized to remove the covers where the label is attached.
194
ThinkSystem ST250 V2 Maintenance Manual

Table of Contents

Other manuals for Lenovo ThinkSystem ST250 V2

Related product manuals