D9U001PPB-010116/106
2 Un-packing manual
Inspection of the consignment after delivery
Do not unpack and/or accept the consignment if the package has any visual damage! If so, issue
a complaint.
Personal qualification
The persons authorised for installation and putting into operation of the product, i.e. those trained
by L I N E T spol. s r.o.
Personnel required for unpacking and installation
Minimum two persons.
Anticipated time
Anticipated time of unpacking is 30 minutes, anticipated time of installation is 30 minutes.
Necessary tools and materials
Philips screwdriver, scissors / knife, 2x polystyrene tracks, included in the packaging.
Required working space
When unpacking, overall bed dimensions should be considered. Recycle used packaging mate-
rials. We recommend unpacking and installation be made in the goods receiving department. For
unpacking operations, observe minimum 0.8m on the sides of the pallet and minimum 2.6m in front
of the pallet (i.e. minimum space for unpacking 2.8 x 5.2m).