EasyManua.ls Logo

Lucent Technologies CBX 500 - Determining the Operating Status; Before You Begin

Lucent Technologies CBX 500
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CBX 500 Multiservice WAN Switch Hardware Installation Guide 4/5/035-1
Beta Draft Confidential
5
Determining the Operating Status
This chapter includes the following topics for determining the operating status:
Status LEDs
Evaluating Power Loads for a Two-Power Supply Switch
Connecting Power to the Switch
Powering Up the Switch
Before You Begin
Before you begin, verify that the following tasks (from Chapter 4) are complete:
1. Set up the switch hardware as a free-standing or rack-mounted unit (see page 4-3).
2. Connect cables and console terminal to the switch (see page 4-9 and page 4-10).
3. Set up the Network Management Station (NMS); see page 4-11.
4. Connect the NMS to the switch (see page 4-11).
5. (Optional) Connect the external clock source inputs and outputs (see page 4-16).
6. (Optional) Connect the remote alarms (see page 4-20).

Table of Contents

Other manuals for Lucent Technologies CBX 500

Related product manuals