UNLOADING AND ASSEMBLY
Form # 169080 Issue – April 2007
STEP 1. UNLOAD HITCH
CAUTION
To avoid injury to bystanders from being
struck by machinery, do not allow persons
to stand in unloading area.
CAUTION
Equipment used for unloading must meet
or exceed the requirements specified
below. Using inadequate equipment may
result in chain breakage, vehicle tipping or
machine damage.
MIN. LIFTING
8000 LB. (3630 KG)
TYPE
OVERHEAD LIFTING
a. Remove hauler's tie down straps and chains.
b. Attach chain to two brackets on top of hitch as
shown.
c. Adjust chain lengths so hitch is lifted evenly.
d. Raise hitch off deck, back up until unit clears
trailer and slowly lower to 6 inches (150 mm)
from ground.
IMPORTANT
Take care not to contact the other
machine if load is two-wide.
e. Take to storage or set-up area and set hitch
down securely on level ground.
f. Repeat for second hitch if required.
g. Check for shipping damage and missing parts.