UNLOADING AND ASSEMBLY
169561 24 Revision C
f. Secure swivel pin with pin (F) and lynch pin.
g. Assemble PTO driveline male half (G) onto
driveline (H) on APT hitch. Push male half so
that driveline is at its fully compressed length.
h. Locate driveline in hook (J).
i. Proceed to STEP 15. MOWER
CONDITIONER/TRACTOR HOOKUP.
H
G
J
F