CHALLENGERSERIES10‐60KVA INSTALLATION
AG–SD‐35Rev.No:1Rev.Date:25.09.2013PublicationNo:2 43
4. Connecttheinputcables.
RtoINPUTL1,
StoINPUTL2,
TtoINPUTL3,
N(Neutral)toINPUTN.
6.Checkthephasesequence.
7.Repeatsteps5‐6foroutputcables.
8.Replacetherearboardandtightenthescrews
Usethecableclipstostabilizethecableswhentheconnectionsaredone.
WARNING:MakesurethattheloadsareisolatedfromtheUPSoutputiftheyarenotready
tobeconnected.
WARNING: Make sure that the cables are connected properly before UPS isstarted.
Additionaly,checkifthereisgalvanicisolationtransformersatinputofUPSandconsider
thelocaldirections.
WARNING:CheckthegroundingbeforestartingtheUPS.Wrongworksorgroundingon
UPSorotherdevicesofinstallatonmaybehazardous.Wrongworksandgroundingmay
damageUPSandanothersystemontheinstallation.
CH1060EN19R0