CHALLENGERSERIES10‐60KVA OPERATION
AG–SD‐35Rev.No:1Rev.Date:25.09.2013PublicationNo:2 54
11. TheloadswhichareconnectedtoUPScanbeturnedon.
After all these steps, check that load is fed through inverter static switches via mimic
diagram.Inacontrarysituation,checkUPStotalandphaseloads.TheUPSgivesaudioalerts
inanoverloadcondition,withoutfeedingcriticalACloads.
4.1.3TestingofTypesofUPSOperation
After first start‐up check device operation by switching between the following modes
manually.
4.1.3.1.SwitchingfromOnlineModetoBatteryMode
TurnCB1OFF.ThisactioncutsoffthemainsvoltageandtheUPSstartsoperatingonbattery
mode.TurnCB1backONagainifeverythingisok.