LEVELUPS SERİSİ 10-20 KVA OPERATION
AG-SD-83 / Publication Date: 15.09.2014 / Rev. No: 0 / Rev. Date:
3.1.5.3 Cable connections
All electrical connections of the UPS are made from the front side of the device.
ATTENTION! 3 pole-circuit breakers (switch) are used for the input and
output of UPS, Neutral line must not be interrupted.
Read the following steps to connect the cables properly.
1. Turn OFF all the distribution board breakers (both
input and output distribution boards) to make sure
that the load and mains are completely disconnected
from any cable.