EasyManuals Logo
Home>Manitowoc>Construction Equipment>18000

Manitowoc 18000 User Manual

Manitowoc 18000
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #161 background imageLoading...
Page #161 background image
Reference Only
Manitowoc Published 12-05-17, Control # 032-23 4-9
18000 OPERATOR MANUAL SET-UP AND INSTALLATION
4
PRE-START CHECKS
Make the following checks before starting the engine upon
arrival at the assembly site. See Section 3 for starting
instructions.
Engine
1. Check for leaks.
2. Check fuel, oil, and coolant levels.
3. Repair or refill as required.
Gear Boxes
1. Check for leaks.
2. Check levels.
3. Repair or refill as required.
Hydraulic System
1. Check for leaks.
2. Check level.
3. Repair or refill as required.
4. Make sure hydraulic shut-off valve is open.
CRANE ASSEMBLY
Rotating Bed Jack Pad Storage Location
On current production cranes, rotating bed jack pads (1,
Figure 4-7
) are stored at the following locations:
1. On carbody counterweight trays (3, View A) during
crane shipment
2. On carbody (4, View B) during crane operation
FIGURE 4-6
P1876
Remote Control Stored in
Rear of Operator’s Cab
FIGURE 4-7
View A
Storage for Shipping (4 places)
View B
Storage for Operation (2 places)
Item Description
1 Jack Pad
2 Snap Pin
3 Carbody
4 Carbody Counterweight Tray
4
1
2
3
1
2

Table of Contents

Other manuals for Manitowoc 18000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 18000 and is the answer not in the manual?

Manitowoc 18000 Specifications

General IconGeneral
BrandManitowoc
Model18000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals