Manitowoc Published 12-05-17, Control # 032-23 4-9
18000 OPERATOR MANUAL SET-UP AND INSTALLATION
PRE-START CHECKS
Make the following checks before starting the engine upon
arrival at the assembly site. See Section 3 for starting
instructions.
Engine
1. Check for leaks.
2. Check fuel, oil, and coolant levels.
3. Repair or refill as required.
Gear Boxes
1. Check for leaks.
2. Check levels.
3. Repair or refill as required.
Hydraulic System
1. Check for leaks.
2. Check level.
3. Repair or refill as required.
4. Make sure hydraulic shut-off valve is open.
CRANE ASSEMBLY
Rotating Bed Jack Pad Storage Location
On current production cranes, rotating bed jack pads (1,
Figure 4-7
) are stored at the following locations:
1. On carbody counterweight trays (3, View A) during
crane shipment
2. On carbody (4, View B) during crane operation
FIGURE 4-6
P1876
Remote Control Stored in
Rear of Operator’s Cab
FIGURE 4-7
View A
Storage for Shipping (4 places)
View B
Storage for Operation (2 places)
Item Description
1 Jack Pad
2 Snap Pin
3 Carbody
4 Carbody Counterweight Tray
4
1
2
3
1
2