EasyManua.ls Logo

Manitowoc 18000 - Page 287

Manitowoc 18000
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 12-05-17, Control # 032-23 4-135
18000 OPERATOR MANUAL SET-UP AND INSTALLATION
4
32 Part
17 Sheave Block
1-1/4 in (32 mm) Rope
Capacities Greater Than 661 USt (600 t)
FIGURE 4-78 continued
TANDEM HOIST DRUM REEVING
#55A Top
Lower Boom
Point
Boom Top Wire
Rope Guide
4-228
SINGLE HOIST DRUM REEVING
Extended Upper Boom Point on #79A Top
FIGURE 4-79
6 Part
4 Sheave Lower Point
1-1/8 in (28 mm) Wire Rope
4 Part
3 Sheave Lower Point
1-1/4 in (32 mm) Wire Rope
Standard Arrangement —
Reeve Lower Point from Left to
Right when Drum 1 is Used
Optional Arrangement —
Reeve Lower Point from Right to
Left when Drum 2 is Used
From Drum 1
From Drum 2
Boom Top Wire
Rope Guide
8 Part
4 Sheave Lower Point
1-1/8 in (28 mm) Wire Rope
6 Part
3 Sheave Lower Point
1-1/4 in (32 mm) Wire Rope
From Drum 1
From Drum 2
Boom Top Wire
Rope Guide
4-229

Table of Contents

Other manuals for Manitowoc 18000

Related product manuals