Installation Comet Executive Gas
2-16
Figure 2-16: Do NOT put setscrews into left
endframe bearings.
Security of Hardware
Required Tools
Allen wrench set
Wrench set
1. Open both endframe doors.
2. Check all hardware connections and
tighten as necessary. Make sure all set-
screws are suciently tightened to hold
their respective components in position.
NOTE: To allow for heat
expansion, bearings in the left
endframe (Figure 2-16) do not
have setscrews. Do NOT put
setscrews into these bearings.
However, if there are any shaft
collars, these do have setscrews
that must be secured.
3. Make sure all protective wrappers and
wooden wedges holding the ironing
cylinder are removed. For more informa-
tion, refer to Final Protective Wrapper
Removal on page 2-15.
4. Close and secure both endframe doors.