EasyManua.ls Logo

Maxon GPTLR-44 - Ground Cable Routing to Pump

Maxon GPTLR-44
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
36
STEP 6 - CONNECT GROUND CABLE
CONNECTING EXTERNAL
GROUND CABLE
FIG. 36-1
INSERTING GROUND CABLE
THROUGH GROMMET
FIG. 36-1A
BOLTING GROUND CABLE TO PUMP
FIG. 36-1B
NOTE: To ensure power unit is correctly grounded, connect 2 gauge ground cable
to grounding connection on pump.
1. Insert external ground cable (parts box)
through grommet on pump mounting
plate (FIGS. 36-1 & 36-1A).
2. Bolt ground cable to ground connection
on pump using existing bolt (FIGS. 36-1
& 36-1B).
3. Form a drip loop on the ground
cable where it enters the grommet
from outside the pump mounting
plate (FIGS. 36-1 & 36-1B).
TERMINAL LUG
TERMINAL LUG
(EXTERNAL GROUND
(EXTERNAL GROUND
CABLE)
CABLE)
GROUND
GROUND
CABLE
CABLE
GROMMET
GROMMET
PUMP MOUNTING
PUMP MOUNTING
PLATE
PLATE
NOTE: Electrical lines must be run into pump box through sealing grommets
(FIG. 36-1A). To ensure a good seal on the electrical lines, never
cut the sealing grommets.
GROUND
GROUND
CONNECTION
CONNECTION
BOLT
BOLT
DRIP LOOP
DRIP LOOP

Other manuals for Maxon GPTLR-44

Related product manuals