EasyManua.ls Logo

MGE UPS Systems 5000 RT - Operation; Initial and Final Start-Up

MGE UPS Systems 5000 RT
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
3.1 Initial Start-Up
To ensure that your system is configured in complete accordance with safety regulations and to benefit from the
manufacturer’s warranty, please contact Technical Support.
UPS Set-Up
If UPS personalization is desired, it is advised to enter the personalization mode at this time (see the 4.4
"Personalization" section).
3.2 Final Start-Up Sequence
3. Press and hold the "I" (on) button (29) for 3 seconds.
The buzzer beeps once, and after UPS internal test
sequence, the LED (20) is ON.
LEDs (30), (32), (34) are green.
The equipment is protected by the UPS.
If LED (21) or (22) is ON, an alarm has occurred (see the
"troubleshooting" section).
20
30 32 34
29
21 22
i
1. Check that the battery disconnect switch (60)
on top cover is connected (see section 2.2
Internal Battery Connection).
2. Set the upstream circuit breaker (not included)
to the on position.
The equipment is powered via the Normal AC source,
but not protected by the UPS.
Batteries are recharging, an 8 hour recharge period is
necessary to get full backup time.
LED (22) is ON, LEDs (33) and (34) are green.
33 34
22
3 — 1
86-87050-00 A01 Operation

Table of Contents

Related product manuals