FINAL ASSEMBLY
1.
Place the FBI Warning Label next to the CPU board. Be sure the label is completely visible.
2.
Locate the Flexible Grommet strip supplied with the kit. Use pieces of
thus
material to line the cable
entry cutout areas in the Perforated Metal Cover. This avords damage to the cabinet wiring harness.
3.
Orient the Perforated Metal Cover over the game electronics with
Its
grommets up and hold it in place,
Mark the locations of the openrngs on the side of the cabinet to permit proper routrng of the cables in
the next set of installation steps. Do not install the cover at this time.
4.
If necessary drill pilot holes for cover screws. Guide wiring through grommets and place the metal
cover over the electronics. Align holes and secure the cover to the plate with the sheet metal screws
provrded in the kit. Ensure that no
wares
are pinched or caught between the cover and the plate.
INITIAL POWER UP
1.
2.
3.
4.
5.
6.
7.
a.
9.
10.
11.
Plug the line cord into a source of A.C. power and turn
It
on. CPU Board indicators should illuminate.
The game will power up and begin self dragnostics.lf no errors are found, the game will automatically
enter its “attract” mode. Check wiring and refer to Troubleshootrng (Section Four) if problems occur.
Unlock and open the corn door. Press the TEST button to enter the menu system. Select
DIAGNOSTICS and choose SWITCH TESTS. Use this screen to verify that each switch and control
operates properly. Refer to Operation (Section Two) for explanatrons of test conditions and results
From the DIAGNOSTICS menu, choose MONITOR TESTS to
confrrm
proper video display operation.
If the monitor remote adjustment controls do not permit satisfactory picture quality to be obtained, the
monitor may not be matched correctly to the CPU Board video
crrcuits.
Jumpers are included in some
monitors to optimize the video impedance. Consult the video monitor manufacturer’s literature for
jumper information. See Operation (Section Two) for test steps or Troubleshooting (Section Four).
From the DIAGNOSTICS menu, choose DISK TESTS to examine the Hard Disk Drive. Run each of
the tests in order to determine correct operation. The tests are described in Operation (Section Two).
From the DIAGNOSTICS menu, choose SOUND SUBSYSTEM TEST to check the audio circuitry. It
may be necessary to raise the volume level higher than normal for this group of tests (Section Two).
From the DIAGNOSTICS menu, choose DIP-SWITCH TESTS to verify optimum switch positions,
From the DIAGNOSTICS menu, choose REAL TIME CLOCK to set the accurate time and date.
From the main menu, select EXIT to begin normal game operation.Open the coin door and press the
SERVICE CREDITS button to allow game play. Press a START button and select a team to begin.
Listen to the audio while playing the game. Note unexpected irregularities in sound (out of phase, no
low frequencies, mono signals from stereo speakers, etc.) Check the wiring harness for internal
shorts or strapped connections. Refer to Wring (Section Three) or Troubleshooting (Section Four).
Close and lock the coin door. Replace the rear cabinet door. Allow the system to operate for
seveim
hours before attempting any game changes. Refer to Operatton (Section Two) for adjustment steps
When proper operation is confirmed, the game may be tested for FCC or other agency approval.
YOU ARE SOLELY RESPONSIBLE, AND MIDWAY WILL HAVE NO RESPONSIBILITY FOR FCC
COMPLIANCE FOR INSTALLATIONS IN PRODUCTS OTHER THAN A MIDWAY
UNIVERSb.’
VIDEO CABINET (MODEL 40135). THE FCC COMPLIANCE LABEL SUPPLIED MUST NOT
7
INSTALLED ON THE CONVERTED PRODUCT UNTIL FCC COMPLIANCE IS VERIFIED.
1-12