EasyManua.ls Logo

Miele PG 8593 - Page 28

Miele PG 8593
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
28
Commissioning
completed
Commissioning is completed when the following message is
displayed.
Set up successful
Confirm the message with OK.
The washer-disinfector is now ready for use.
Universal
Temperature
Duration
h1:30
75 °C
The settings made during the commissioning process are only
adopted after a complete programme has been run.
Select any programme, e.g.: Drain.
Press the Start/Stop button to start the programme.
After commissioning, every programme starts with reactivation of
the water softener.
Fault420
If the programme is cancelled using Fault420, this means that all the
plumbing connections are deactivated.
Confirm the error message with OK.
Switch the machine off using the button.
Wait approximately 10 seconds before switching the machine on
again with the button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing
connection; e.g. for cold water.

Table of Contents

Related product manuals