EasyManua.ls Logo

Miele PG 8593 - Commissioning; Installation and connection; Procedure

Miele PG 8593
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
25
Installation and connection
Before commissioning the machine must be securely installed, and
the water inlet and drain hoses and the mains cable correctly
connected. See “Installation”, “Plumbing connections” and “Electrical
connection” and the installation diagram supplied.
Procedure
During commissioning a set procedure is followed which must not be
interrupted. The display will automatically guide you through the
process.
All settings, except for selecting plumbing connections, can be
retrospectively altered via the Settings  and Further settings menus.
The settings made during the commissioning process are only
adopted after a complete programme has been run.
If the programme is interrupted or if no programme is started and
the machine is switched off, the commissioning process must be
carried out again.
Switching on
Press the button until the LED lights up.
Select
language
The commissioning process starts with selecting the language.
Language 
english (GB)
english (USA)
(
Use the and arrow buttons to select the language you want
and touch OK to save.
Select
temperature unit
The menu for selecting the temperature unit will then appear.
Temperature unit
°C
°F
Use the and arrow buttons to select the temperature unit you
want and touch OK to save.

Table of Contents

Related product manuals