6 MM571W / MM572W Installation Instructions
T
L
L
V
P
S
S
N
N
T
L
L
V
P
N
S
S
N
Secure the gate bracket with the
supplied hardware as shown.
Once the gate post and gate
brackets are installed, reattached
the operator arm.
Ensure the operator arm is level,
adjusting the post bracket location
if necessary.
Once level, ensure all hardware is
tight.
Remove excess bolt length with a
hacksaw.
Step 10
Step 11
PULL-TO-OPEN OPERATOR MOUNTING
Your Property
Installing the Secondary Operator (MM572W only):
Install the secondary operator on the remaining leaf by repeating the same process illustrated in steps 1-11 above.
Note: You will need to run the secondary operator power cable and any hard wired accessory wires under the driveway to the
control box (use of conduit is recommended). Locating the primary operator on the gate leaf closest to the power source or desired
solar panel location is recommended. See front page of this manual for a complete installation example.
After you have mounted the second operator, proceed to Installation of the Closed Position Stop Plate on the following pages.