EasyManua.ls Logo

Millipore DIRECT-Q 3 SYSTEM - Installation of the; Installation

Millipore DIRECT-Q 3 SYSTEM
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
- 14 -
HAZARD
!
4-4 INSTALLATION OF THE SMARTPAK
Open the Tank Outlet Valve before installing a
new SmartPak. This keeps the tank from filling
until the SmartPak is rinsed out (A).
Do not touch the UV Lamp when replacing the
SmartPak.
I
NSTALLATION
Make sure the front cover is opened.
STANDBY should be viewed on the Display
(B).
Remove the SmartPak from its shipping box.
Remove the protective caps on the ports of the
SmartPak and from the system.
Locate the O-rings on the ports (C). Wet them
with water. It is preferable to wet them with
ultrapure water.
A
B
C
ATTENTION

Table of Contents

Related product manuals