EasyManua.ls Logo

Millipore DIRECT-Q 3 SYSTEM - Chapter 6: Maintenance Schedule and Procedures; Maintenance Schedule; Replace SmartPak; Replace Final Filter

Millipore DIRECT-Q 3 SYSTEM
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
- 37 -
Chapter 6 MAINTENANCE
6-1 MAINTENANCE SCHEDULE
WHAT TO DO WHEN? HOW TO?
When the Pack
Alarm display is
blinking.
When the system
resistivity display is
blinking.
SmartPak
Replacement
After a system or tank sanitization.
See Section 6-2.
Final Filter
Replacement
The Final Filter is replaced when the SmartPak is
replaced or when the Product Water flowrate drops.
See Section 6-3.
Vent Filter
Replacement
Replaced when the SmartPak is replaced.
See Section 4-5.
Flow Calibration
When the Final Filter is replaced, or periodically.
See Section 4-10.
Tank Level
Calibration
Periodically.
See Section 6-5.
UV Lamp
Replacement and
UV Timer Reset
When the UV Lamp
Alarm display is
blinking.
See Sections 6-9 and
6-10.
Screen Filter
Cleaning
2 times a year or as necessary.
See Section 6-4.
Sanitization of the
System
Once a year. The SmartPak will have to be replaced
after the sanitization of the system.
See Sections 6-7 and
6-6.
Sanitization of the
Tank
Once a year.
See Section 6-8.

Table of Contents

Related product manuals