Basic Post Installation Checks
1. Turn on electrical
supply.
3. Temperature to full
cold.
4. Start shower to test for
water ow. If a shower
drain pump is tted, it
should also start.
5. If there is no water
after 5 seconds, make
sure that appliance
has been primed.
5 secs
2. Power to appliance,
check Start/Stop for
blue light.
6. Push Start/Stop to
turn off appliance.
Pulsing light and
"beep" indicates that
appliance is shutting
down.
7. Appliance will purge water from
heater tank for a few seconds.
Important! DO NOT isolate power
until water has stopped.
Go to section: "Commissioning".

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mira Advance ATL J97C and is the answer not in the manual?

Mira Advance ATL J97C Specifications

General IconGeneral
BrandMira
ModelAdvance ATL J97C
CategoryPlumbing Product
LanguageEnglish

Related product manuals