EasyManua.ls Logo

Mitsubishi Electric MELFA RV-3SDB Series - Page 47

Mitsubishi Electric MELFA RV-3SDB Series
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Unpacking the robot system
SD-/SQ series 3 - 3
RV-12SD/SDL and RV-12SQ/12SQL
The robot arm is packaged in a wooden frame. The following figure shows you step-by-step how to
unpack the robot arm.
Place the wooden frame on an even surface.
To open, remove the nails from the wooden frame.
Remove the wooden frame and the packaging material.
Remove the four fixing screws with which the base is screwed onto the wooden frame.
Transport the robot arm to the place of installation, as described in Section 3.2.
NOTE
Keep the packaging and transport locks for later transport.
R001458E
Fig. 3-3: Unpack articulated arm robot RV-12SD/SDL and RV-12SQ/12SQL
Robot arm
Wooden frame

Table of Contents

Related product manuals