EasyManua.ls Logo

Mitsubishi Electric MELFA RV-7FRL-D - Page 51

Mitsubishi Electric MELFA RV-7FRL-D
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Unpacking to Installation
Confirming the operation
2-39
When the [+A (J4)] keys are pressed,
6-axis type: the X axis will rotate in the plus direction.
5-axis type: the Z axis will rotate in the plus direction of the tool coordinate system.
When the [-A (J4)] keys are pressed, rotate in the minus direction.
When the [+B (J5)] keys are pressed,
6-axis type: the Y axis will rotate in the plus direction.
5-axis type: the Y axis will rotate in the plus direction of the tool coordinate system.
When the [-B (J5)] keys are pressed, rotate in the minus direction.
When the [+C (J6)] keys are pressed,
6-axis type: the Z axis will rotate in the plus direction.
5-axis type: There is no operation.
When the [-C (J6)] keys are pressed,
6-axis type: rotates in the minus direction.
5-axis type: There is no operation.
Changing the flange surface posture
* The flange position does not change.
This is the same as the A, B and C axis XYZ jog operation.
+X
+Y
+Z
-Z
-Y
-X
+X
+Y
+Z
SPACE
,
制御点
+X
+Y
+Z
-Z
-Y
-X
+Y
+Z
制御
(ツー座標系)
Control
point
T
o
o
l
l
e
n
g
t
h
6-axis type 5-axis type
T
o
o
l
l
e
n
g
t
h
Control point
(Tool coordinate
system)

Table of Contents

Related product manuals