16-12
ENGINE ELECTRICAL
-
Charging System
GENERATOR
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
l Removal and Installation of Right Bank Warm Up
Three-Way Catalytic Converter
(Refer to GROUP
15-Exhaust
Pipe, Main Muffler
and Catalytic Converter.)
14-18ft.lbs.
l b
Removal steps
1. Air hose E
<Turbo>
2. Air hose C <Turbo>
3. Suction hose clamo nuts
<Vehicles with air
conditioning,
4. Drive belt
(Refer to GROUP 11
-
Engine Adjustment.)
216FO346
5. Generator connector
6. Heated oxygen sensor connector
7. Generator and generator bracket
assembly
8. Generator bracket
9. Generator
lo-12
Nm
7-9
ft.lbs.
24 Nm
REMOVAL SERVICE POINT
dAbCLAMP NUT REMOVAL
On vehicles with an air conditioning, remove the clamp
nut, raise the suction hose and suspend it from the engine
hood using a cord.
1
TSB Revision