EasyManua.ls Logo

Morbark BEEVER M12RX - Lockout Procedure

Morbark BEEVER M12RX
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.7
Moving parts can crush and cut.
Follow lockout procedures
before servicing.
39510-212ES
PELIGRO
Los componentes móviles pueden aplastar y cortar.
Cumpla con todos los procedimientos de bloqueo antes
de prestar servicio.
DANGER
Failure to comply will result in death or serious injury.
El incumplimiento puede resultará en la muerte o en una herida grave.
Moving parts can crush and cut.
Follow lockout procedures
before servicing.
39510-212ES
PELIGRO
Los componentes móviles pueden aplastar y cortar.
Cumpla con todos los procedimientos de bloqueo antes
de prestar servicio.
DANGER
Failure to comply will result in death or serious injury.
El incumplimiento resultará en la muerte o en una herida grave.
Morbark chippers are custom built to customer specifications. Control
panels, power configurations, and other features may differ from each
machine. It is the responsibility of each employer/owner to develop and
implement lockout (energy control) procedures specific to their machine.
Lockout of the machine prevents unexpected start-up or motion, release
of stored energy, and operation of the machine. It is mandatory the
Lockout Procedure
DANGER!
Failure to lockout during maintenance
(e.g., repair, clean-out) of the equipment
or machine will result in serious personal
injury or death. Always follow lockout
procedures and lock out the machine
before conducting maintenance.
machine is locked out when left unattended, shutdown, or while
performing maintenance. As a safety and crime prevention method, the
power must be disconnected when the machine is being stored.
Only authorized personnel shall lockout the machine. All employees who
handle, operate, and maintain the machine shall be trained on the
lockout procedure in accordance with this manual, ANSI Z244.1, and
OSHA requirements.
Include the following in your lockout (energy control) procedures:
Each person authorized to lockout the machine must have a safety
lock and key dedicated to the machine lockout
Authorized personnel must verbally notify affected employees of the
machine lockout, and post a sign(s) indicating the power lockout
condition near the machine controls
The engine, electrical panel, or other power source must be locked
out before adjustments or repairs are made
Figure 1.2
Notification of lockout
Control panel with
key lock
76347-385 06-15
Safety Start-up Checklist Safety Lockout Procedure