3 Installation
The device should be installed where gas leaks are expected. The installation position depends on the gas
density, either in the upper area of the room under the ceiling for gases lighter than air or close to the ground
for gases heavier than air. Also consider how air movement may affect the ability of the device to detect gas.
The display on the front of the instrument must always be clearly visible, the view must not be obstructed.
Before beginning the installation, check that the delivered components are complete and
correct, referring to the shipping documents and the sticker on the shipment carton.
When preparing the assembly, make sure that the mounting arrangement is correct for the
particular device.
3.1 Mechanical Installation
Preparation
To install the device, first remove the backplate.
Undo Screws
1. Unscrew the device.
GB PrimaX 12
3 Installation