SOLAS shielding
– Installation 73
SOLAS shielding as per MTN 5233 – Installation 72
Spare parts service 152
Starter
– Condition check 109
Startup
– After extended out-of-service periods (>3 months) 53
– Putting into operation after scheduled out-of-service-pe-
riod 54
T
Tasks
– After extended out-of-service periods 55
Tasks after extended out-of-service periods (>3 weeks) 55
Tightening specifications
– Nuts 18
– Screws and bolts 18
– Screws, nuts and bolts 18
Transport 8
Troubleshooting 69
– Fuel treatment system 68
V
Valve clearance
– Adjustment 88
– Check 88
W
Water drain valve
– Check 131
Water level probe (3-in-1 rod electrode)
– Check 133
M015655/05E 2015-06 | Appendix B | 163
DCL-ID: 0000014251 - 003